Thetford 19621 - Seal Replacement Package Uživatelský manuál Strana 4

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 3
Fig. K
Nozzle Connector
Locking Nut
Nozzle As-
sembly
Gasket
Foam
Nozzle
Seal
Nozzle Con-
nector
Nozzle
Back wall of
china bowl
5. Holding Hinge Post Nuts from inside (Fig. J), turn screwdriver
counterclockwise to unscrew Hinge Posts. Remove Nuts and Bolts
(but not Seat/Lid).
6. Take note of Overow Tube position for future reference. Pull
Overow Tube off center Nozzle Connector.
7. To remove 2 outside Nozzle Connectors (Fig. I), push them in,
twist counterclockwise and pull back. (They may be caulked tight
and difcult to remove. Use pliers if necessary.)
8. Remove Locking Nut from center Nozzle by turning counterclock-
wise until it releases. Save Locking Nut.
9. Scrape away 3 Seals and Sealant with a sharp-edged tool. Use
mineral spirits to remove all residue from china.
To Replace Parts (Fig. K)
1. Push small Foam Seal over Flush Cover barb. Position new Flush
Cover/Nozzle Assembly in bowl. (Be sure Foam Seal is stuffed
completely/ush into opening.)
2. Place Locking Nut on center Nozzle. Holding Nozzle Assembly
rmly in position from inside Toilet Bowl, Turn Locking Nut clock-
wise to lock. (Note: all 4 prongs must mate with locking ears to
achieve proper lock.)
3. Adhere Nozzles to Connectors. Again Holding Nozzle Assembly
rmly, push in hard and rotate clockwise (you will feel it lock).
4. Reattach center Overow Tube. Tuck in Tube. To form a water
trap, it must be curved at approximately same position as when
removed.
5. Align/adjust Flush Cover/Nozzle Assembly level to Toilet inside
bowl.
6. Align Seat/Cover Assembly. Replace Hinge Posts and reattach
Nuts. Tighten rmly (Fig. J).
7. Swing entire Valve/Hose Assembly upright. Holding Metal Bracket
rmly to avoid bending it, slide Solenoid Valve back into slot in
Bracket. Rearrange Wire Harness.
8. Reconnect Hoses to outside Flush Nozzles. Push on rmly (Fig.
J).
9. Attach new Tie Strap holding Solenoid Valve to Metal Bracket (Fig.
K).
To Replace Toilet To Floor
1. Secure new Closet Flange Seal, lip side up, to Toilet.
2. Position Toilet over ange.
3. Reconnect Water Supply Line.
4. Reconnect 12-volt power supply to Toilet.
5. Reconnect RV’s power supply to the Toilet.
6. Turn on RV’s water supply. Press Toilet ush button to close blade
and to ush test.
7. Secure to oor with Lag Screws. Tighten.
8. Resecure Bolt Caps.
Overow Tube
Water Sole-
noid Valve
Fig. J
Tie Strap
Hinge
Post
Bolts
Metal Bracket
Part #19621
Seal Replacement Package Page 4
Zobrazit stránku 3
1 2 3 4

Komentáře k této Příručce

Žádné komentáře